Description
This procedure covers the requirements associated with excavation and trenching work, including the selection of equipment to be used, transporting the excavation equipment to the work site, pegging the area to be excavated, the excavation work, spoil heaps, barricading and shoring of trenches, back-filling and clean-up of the work site.